Phone: 0421 841 363
Email: jake@lbclandscapes.com.au

Heidelberg Synthetic Grass

About Project

The LBC Landscapes team began by removing the existing surface and laying down crushed rock. Using a whacker to compress the crushed rock, we created an even surface and reduced the chance of weeds growing through over time. We then cut the Synthetic Grass to size and lay it in place. To ensure that the newly laid Synthetic Grass stays in position, we nailed it to the crushed rock and poured sand over the top. By sweeping the sand to the base, the Synthetic Grass is weighed down and each blade is forced to stand up straight, giving the turf a more lifelike appearance.

Related Projects

Mitcham Landscape

The LBC team constructed a formal garden in Mitcham.

Continue Reading

Templestowe Landscape

Transforming an outdated environment into a modern and usable space.

Continue Reading

Indoor Garden Box Hill

This indoor garden brings life to the main entry point of the apartments. The balance of the water feature, timber seats and pot plants compliment each other. Extremely low maintenance and aesthetically pleasing.

Continue Reading

Kew East

Our vision for this project was to create a useable low maintenance outdoor space with a focus on aesthetics and practicability.

Continue Reading